Jump to content
Sign in to follow this  
buildingcincinnati

Columbus: Short North Developments and News

Recommended Posts

Kaufman Looking for Buyers for IBEW Site in Short North

 

The former International Brotherhood of Electrical Workers (IBEW) site at 23 W. Second Ave. appears to be on the market again. The 1.5-acre piece of land was purchased by Kaufman Development in 2016 and has since been the subject of dozens of meetings of the Victorian Village Commission.

 

A new website is touting the site as “an incredibly rare development opportunity in the nationally recognized Short North Arts District of Columbus.”

 

The national marketing effort follows the developer’s announcement last July that its plans for the site were on hold. The latest iteration of the project – which called for a mix of office, retail and residential uses – had failed to gain the support of the commission.

 

More below:

https://www.columbusunderground.com/kaufman-looking-for-buyers-for-ibew-site-in-short-north-bw1

 

Yup, this one wasn't hard to see coming.

Share this post


Link to post
Share on other sites

Kaufman puts stalled Short North development site on the market

 

Frustrated with repeated pushback from residents and area commission rejections, Kaufman Development is selling a Short North property where it planned to rehab two buildings and put up a grand tower.

 

The developer has launched a website to market the 23 W. 2nd Ave. site.

 

The developer paid $3.25 million for the 1.6 acres in April 2016, and proposed rehabilitating it as a mixed-use development. The plans were reworked again and again to appease neighbors who said the project would affect traffic, parking and utilities. After failing to gain backing from Victorian Village Commission, Kaufman walked away from the project in July.

 

More below:

https://www.bizjournals.com/columbus/news/2018/10/03/kaufman-puts-stalled-short-north-development-site.html

Share this post


Link to post
Share on other sites

It's getting to the point where I can't even visualize where these buildings are anymore - so much construction! 

 

Question for those still in Columbus:  how much more space is there in SN for future growth? Is it close to being built-out? What do the next 5 years have in store?

Share this post


Link to post
Share on other sites
45 minutes ago, surfohio said:

It's getting to the point where I can't even visualize where these buildings are anymore - so much construction! 

 

Question for those still in Columbus:  how much more space is there in SN for future growth? Is it close to being built-out? What do the next 5 years have in store?

 

There are still a few spots that need to be developed before it's truly built out.

 

This is strip mall will desperately needs to be redeveloped: https://www.google.com/maps/@39.9807521,-83.0042504,3a,62.6y,303.98h,89.41t/data=!3m6!1e1!3m4!1slVtdTdE5ylRRAZE-i1Lmqw!2e0!7i13312!8i6656?hl=en

 

Then, there is this whole block that is a possibility: https://www.google.com/maps/@39.983157,-83.0047136,3a,75y,278.56h,90.66t/data=!3m6!1e1!3m4!1sXhE5ZsUVXdzBUAQlDQ249A!2e0!7i13312!8i6656?hl=en

 

Here's another potential spot: https://www.google.com/maps/@39.9842746,-83.0049344,3a,75y,279.07h,89.18t/data=!3m6!1e1!3m4!1s5FCgbN6NCGu2x0l7E75uXA!2e0!7i13312!8i6656?hl=en

 

This spot has a lot of potential due to it's size: https://www.google.com/maps/@39.9850497,-83.0050857,3a,75y,243.06h,80.64t/data=!3m6!1e1!3m4!1sl98_C_b1-xTULJRpLXdscQ!2e0!7i13312!8i6656?hl=en

 

Other than those spots, there isn't much more that can be developed without tearing down historical buildings. The good news is development is already starting to spread east into Italian Village. 

  • Like 2

Share this post


Link to post
Share on other sites

^There's a 5 story building planned for the former Yoga on High site. Wonder when that will start construction?

  • Like 1

Share this post


Link to post
Share on other sites
30 minutes ago, Pablo said:

^There's a 5 story building planned for the former Yoga on High site. Wonder when that will start construction?

 

Oh that's right,  I completely forgot about that. I can't keep track of all of the developments happening right now.

Share this post


Link to post
Share on other sites
37 minutes ago, Pablo said:

^There's a 5 story building planned for the former Yoga on High site. Wonder when that will start construction?

They applied for their building permit two days ago so they’ll probably break ground in the spring unless it gets approved unusually quickly. 

  • Like 1

Share this post


Link to post
Share on other sites
4 hours ago, cbussoccer said:

 

There are still a few spots that need to be developed before it's truly built out.

 

This is strip mall will desperately needs to be redeveloped: https://www.google.com/maps/@39.9807521,-83.0042504,3a,62.6y,303.98h,89.41t/data=!3m6!1e1!3m4!1slVtdTdE5ylRRAZE-i1Lmqw!2e0!7i13312!8i6656?hl=en

 

Then, there is this whole block that is a possibility: https://www.google.com/maps/@39.983157,-83.0047136,3a,75y,278.56h,90.66t/data=!3m6!1e1!3m4!1sXhE5ZsUVXdzBUAQlDQ249A!2e0!7i13312!8i6656?hl=en

 

Here's another potential spot: https://www.google.com/maps/@39.9842746,-83.0049344,3a,75y,279.07h,89.18t/data=!3m6!1e1!3m4!1s5FCgbN6NCGu2x0l7E75uXA!2e0!7i13312!8i6656?hl=en

 

This spot has a lot of potential due to it's size: https://www.google.com/maps/@39.9850497,-83.0050857,3a,75y,243.06h,80.64t/data=!3m6!1e1!3m4!1sl98_C_b1-xTULJRpLXdscQ!2e0!7i13312!8i6656?hl=en

 

Other than those spots, there isn't much more that can be developed without tearing down historical buildings. The good news is development is already starting to spread east into Italian Village. 

The strip center next to the Wood Co building will probably be redeveloped once Wood finishes their multiple large projects they're working on now; i.e. Hubbard Park Place, Parkside on Pearl, and Market Tower. I'd like them to purchase the IBEW lot and have one large project that might more easily pass the commission, and financing rounds.

 

The check cashing place, and the old Dollar General can't hold out too much longer I wouldn't think.

 

In addition to the Luxe 23 project at the former Yoga on High building you also have the Corso Ventures property that currently houses Montecristo House of Cigar that had that preliminary Miami Beach-looking condo building that was put out there.

 

Other than that, you have the city-owned parking lot across from the Stonewall building south of the Garden Theater that needs developed.

 

That's five, perhaps six, projects before the Short North is fully built out and it moves north to fill the Weinland Park gap to campus.

Edited by aderwent

Share this post


Link to post
Share on other sites
5 minutes ago, aderwent said:

The strip center next to the Wood Co building will probably be redeveloped once Wood finishes their multiple large projects they're working on now; i.e. Hubbard Park Place, Parkside on Pearl, and Market Tower. I'd like them to purchase the IBEW lot and have one large project that might more easily pass the commission, and financing rounds.

 

The check cashing place, and the old Dollar General can't hold out too much longer I wouldn't think.

 

In addition to the Luxe 23 project at the former Yoga on High building you also have the Corso Ventures property that currently houses Montecristo House of Cigar that had that preliminary Miami Beach-looking condo building that was put out there.

 

Other than that, you have city-owned parking lot across from the Stonewall building south of the Garden theater that needs developed.

 

That's five, perhaps six, projects before the Short North is fully built out and it moves north to fill the Weinland Park gap to campus.

 

There is a tiny sliver of a surface lot next to the Greystone Apartments. I will be interested to see if anything ever gets built there. 

 

https://www.google.com/maps/@39.9788161,-83.0038624,3a,75y,293.62h,92.48t/data=!3m6!1e1!3m4!1s_viBKtt_mdVda082kOrVPg!2e0!7i13312!8i6656

Share this post


Link to post
Share on other sites
3 hours ago, aderwent said:

The strip center next to the Wood Co building will probably be redeveloped once Wood finishes their multiple large projects they're working on now; i.e. Hubbard Park Place, Parkside on Pearl, and Market Tower. I'd like them to purchase the IBEW lot and have one large project that might more easily pass the commission, and financing rounds.

 

The check cashing place, and the old Dollar General can't hold out too much longer I wouldn't think.

 

In addition to the Luxe 23 project at the former Yoga on High building you also have the Corso Ventures property that currently houses Montecristo House of Cigar that had that preliminary Miami Beach-looking condo building that was put out there.

 

Other than that, you have the city-owned parking lot across from the Stonewall building south of the Garden Theater that needs developed.

 

That's five, perhaps six, projects before the Short North is fully built out and it moves north to fill the Weinland Park gap to campus.

 

Don't forget the Union Cafe addition :)

 

 https://www.columbusunderground.com/major-addition-proposed-for-union-cafe-bw1

Share this post


Link to post
Share on other sites
On 10/11/2018 at 3:41 PM, aderwent said:

The strip center next to the Wood Co building will probably be redeveloped once Wood finishes their multiple large projects they're working on now; i.e. Hubbard Park Place, Parkside on Pearl, and Market Tower. I'd like them to purchase the IBEW lot and have one large project that might more easily pass the commission, and financing rounds.

 

The check cashing place, and the old Dollar General can't hold out too much longer I wouldn't think.

 

In addition to the Luxe 23 project at the former Yoga on High building you also have the Corso Ventures property that currently houses Montecristo House of Cigar that had that preliminary Miami Beach-looking condo building that was put out there.

 

Other than that, you have the city-owned parking lot across from the Stonewall building south of the Garden Theater that needs developed.

 

That's five, perhaps six, projects before the Short North is fully built out and it moves north to fill the Weinland Park gap to campus.

 

I made an account here basically to post everything you just did, haha. Good summary.

 

Also, hello Urban Ohio! This is my very first post here! I can't believe I just now found this place. This is a treasure.

 

As far as Union Cafe's addition, I hope it actually happens! For some reason I'm skeptical of that one.

 

 

  • Like 2

Share this post


Link to post
Share on other sites

The latest City update on the High St. streetscape project indicated asphalt paving will start 10/22. Sidewalk and planter work will continue - they're getting close to completion. I imagine traffic light installation and removal of the remaining wood poles may stretch into next year. It also indicated utility work will begin in the coming weeks on the next phase from Starr to 9th Ave with sidewalk work beginning in 2019. Also included were private development updates:

 

Private Development Project Updates

711 North High
Build-out is set for completion next month.

750 North High (Bollinger Tower)
During construction, the parking lot behind the tower is being used for construction purposes and unavailable for vehicles. Build-out is set for completion summer 2019.

800 North High (Moxy Hotel)
Build-out is set for completion September 2019. Foot traffic is able to travel through on a portion of the new sidewalk.

875 North High (The Mercantile Development)
Buildout of the development is set for completion May 2019. The lane and sidewalk restrictions on W. First Ave. between High and Park streets will continue through the beginning of December.

40 W. First Ave (Improve it! Development)
Buildout is set for completion June 2020.

900 North High (UDF DEVELOPMENT)
Buildout is primarily complete with tenant construction and move-in occurring now.

944 North High(THE BRUNNER BUILDING)
Buildout is primarily complete with tenant construction and move-in occurring now.

965 North High (THE CASTLE)
Buildout is primarily complete with tenant construction and move-in occurring now.

1160 North High (STONEWALL COLUMBUS)
Buildout is set for completion next month.

Edited by Pablo

Share this post


Link to post
Share on other sites

UDF Opens Updated Short North Location

 

The long wait is over. United Dairy Farmers closed their old Short North location in April 2017, but promised to return with a bigger and better store located inside the four story mixed-use office building that was replacing their suburban-style spot at 900 North High Street. The new UDF opened up to customers this weekend, brining back their expected selection of convenience store goods along with an assortment of new offerings, including a “Barista Bar” with cold brew and nitro coffees.

 

More below:

https://www.columbusunderground.com/photos-udf-opens-updated-short-north-location-we1

 

udf-short-north-01-1150x550.jpg

Share this post


Link to post
Share on other sites

I just went into this UDF today. It's very nice. Like.....the nicest UDF I've ever been in. My goodness, this is what's been missing from my life. So glad to see them back in the Short North. Sometimes you just don't want to spend $20 on a bougie dinner and just want to make a Bob Evans sausage link in a bun with whatever toppings your heart desires for less than $2.

 

Interesting bit: It seems like there are two "garage" doors that open up and can have seating for eating where those rails are in that picture above.

Edited by Zyrokai

Share this post


Link to post
Share on other sites

The Bollinger Tower hotel project has cordoned off the High St. frontage yesterday. Should see activity on the additions to the building soon.

 

31760282978_fec2cfe3cf_c.jpg

Share this post


Link to post
Share on other sites
Just now, SavedTheCrew said:

 

Am I the only one that thinks this building is about as ugly as it could be? I thought the orange outside signified it had still been under construction this whole time 

 

The actual units look pretty nice based on the pictures, and the large windows will be nice I'm sure. The outside is atrocious though. 

Share this post


Link to post
Share on other sites
22 hours ago, SavedTheCrew said:

 

Am I the only one that thinks this building is about as ugly as it could be? I thought the orange outside signified it had still been under construction this whole time 

 

Nope. The color is just awful. I thought it looked like a cool building until they put the siding on, which I as well thought was construction siding for a while. But the building is actually fine in design, I think, outside of that atrocious siding, lol.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

  • Recently Browsing   0 members

    No registered users viewing this page.

×